Adventure Bay Water Treatment Plant Interim Upgrade Project*

Client
TasWater
Type of contract
Modular Solution
Facilities
Disinfection plant
Technology
Ultraviolet disinfection and Hydra-Mix submersible reservoir mixer
Design capacity
Design flow @ minimum validated UVT: At least 1.6L/s at equal to or less than 75%UVT
Term
N/A
Capital cost
N/A
Services
  • Water treatment
Facilities
Disinfection plant

Adventure Bay Water Treatment Plant Interim Upgrade Project*

TRILITY was engaged to design, supply, fabricate, install, test and commission a replacement ultraviolet disinfection system, as well as installing a new control system for measuring and controlling the water usage.
In addition, a Hydra-Mix system was installed in the clear water storage tank to mix, and where necessary, rechlorinate the supply.